Our team spent 10–12 November at the Austria Center Vienna for Enlit Europe 2026. The show brought together more than 15,000 industry professionals from over 140 countries and some 750 exhibitors — from grid operators and utilities to system integrators, effectively the full decision chain behind Europe’s energy transition. As a manufacturer of metering components and magnetic materials, we deliberately kept our footprint small this year: Besides the fixed booth stand, we also walked the floor with samples in hand, met the customers we already work with and opened conversations with several new ones about what could come next.
What’s changing in the industry
The clearest takeaway from three days on the floor is that the battleground in European smart metering has moved from “can it connect” to “can its data be trusted.” The EU’s mandatory rollout under Directive 2019/944 is still running — around 60% of European households had a smart meter by the end of 2024, with penetration above 80% in fifteen member states — but the conversations we heard most this year were about the encryption and continuous threat-monitoring obligations of the NIS2 Directive, and about how vendors differentiate once DLMS/COSEM has levelled the standardisation playing field. For upstream component suppliers like us, this has changed the very first question in an enquiry: not the unit price, but “can you show us batch-to-batch consistency data on your materials.”
What we took away
A large share of the customers we met came from Germany, Austria, the Czech Republic, Hungary and across Central and Eastern Europe, and their priorities converged on three points: progress on EU-standard certification, local delivery capability, and the stability of long-term supply. That matches what we already believed — Europe is short of manufacturing partners who can clear compliance and deliver reliably at the same time, not of suppliers in general. On site we had in-depth exchanges with a number of meter manufacturers and system integrators on fitting current transformers, shunts and core materials, and came away with technical specifications for several concrete projects, which is worth far more than a stack of business cards.
What comes next
The show is a starting point, not a finish line. We have consolidated the technical requirements we gathered into a working list and will follow up on each item. The energy transition is a long-cycle undertaking, and metering — the most basic entry point for all the data on top of it — sets the ceiling for everything built above it. We intend to keep doing the unglamorous work well: getting the materials and the process right.
Post time: Nov-25-2026
